Home Home Home Home News Careers Home

sublinkov
sublink1
sublink2
sublink3
We are a Florida Certified General Contractor: CGC1513194

Construction

Osceola National Forest --Hog Pen Landing Restoration
AHA received a sole sourced award for this work after successfully completing the
Ocean Pond Sewer Renovation: $89,250

Evaluation: PDF

AHA demolished the existing restroom facility at Hog Pen Landing for the US Forest Service. AHA designed the layout of the entire area including surveying. Work included clearing and site prep, excavation and embankment for the installation of two new restroom buildings. AHA was the project manager and provided labor to assist in the installation of 2 CXT Rocky Mount single vault restrooms as per the US Forest Service vendor contract with CXT. AHA also provided the excavation for the below grade vaults to facilitate the installation of the restrooms. Concrete work preparation included form layout and installation of rebar cages. AHA's concrete work included the construction of ADA compliant sidewalks and parking areas with the addition of a concrete host pad. AHA also relocated an existing small building as per specifications. Also sodded & seeded the landscape.
Contact: Steve Cromer COR 352-427-4548


 
Ocean Pond Recreation Area Sewer System Renovation
Prime Contract for US Forest Service: $117,100

Evaluation: PDF

The project completed by AHA at the Ocean Pond Recreation area in the Osceola National Forest for the USDA Forest Service developed a key relationship with this agency. AHA's successful completion of this project led to additional Forest Service work.

AHA was tasked with the renovation of an existing sewer system and lift stations. The project work included the clearing & grubbing of approximately an acre of land for the construction of a new sanitary mound. We abandon the existing sanitary mound and excavated in preparation for the new mound. AHA built the new mound including drainage aggregate and drainage pipes and vents. We pumped all sewage tanks including the main station and two auxiliary stations. AHA replaced all of the effluent main lift station including the installation of new tanks, pumps, electrical and rail guide system. We replaced the existing water towers for the sanitary dump station and underground pipe. Replacing the underground pipe was achieved after cutting the roadway and repaving the roadway after the new pipe was installed. An additional 380' of underground pipe was replaced at one of the auxiliary lift stations. Further electrical work was completed and the entire new sanitary mound and adjacent areas were sodded and mulched.

Contact: Steve Cromer, COR (352)-427-4548

 

Robert Tabone
Phone:
(904) 982-3946
Email:
rtabone@aha-llc.com
Resume:
Resume

Doug McGough
Email:
dmcgough@aha-llc.com
Resume:
Resume

Andy Harold
Email:
aharold@aha-llc.com
Phone:
(904) 265-1940
Address:
11200 St. John's Industrial Pkwy. Suite 1
Jacksonville, FL 32246

Downloads
Construction Brief
- 2 pages:
Download
AHA SBA CCR:
Download


Copyright © 2008 A. Harold+Associates, LLC